RFP: Consultant Services for Downtown Saranac Lake Streetscape Design Guidelines
/The Franklin County Economic Development Corporation (FCEDC) is seeking proposals from qualified firms to develop comprehensive streetscape design guidelines for downtown Saranac Lake, New York.
These guidelines will establish a cohesive, aesthetically pleasing, and functional design framework for public infrastructure, including but not limited to signage, street furniture, lighting, pedestrian amenities, and landscaping.
The deadline for responses is 5:00 PM on Friday February 21, 2025. The RFP is available on our website at adirondackfrontier.com/doing-business/bids and it is also attached to this email.

The Town of Clifton Park has an Opening for the position of Director of Planning. The position is a full-time position, which will be offered at a Grade 12 with steps 5-9. The starting compensation will therefore range from $115,083 - $130,704, depending upon the experience and qualifications of the successful candidate. The Job description and minimum qualifications for the position is detailed below.